Software & IT Parks

Powering the digital world with zero-downtime infrastructure.

In tech environments, uninterrupted power and precise climate control are non-negotiable. We specialize in critical electrical systems, advanced HVAC for server rooms, comprehensive cabling (data/voice), and seamless MEP coordination to support 24/7 operations.

 Co-Karma Co-Working Space, Kokapet

Project at a Glance

  • Location: Myscape Weave, 4th Floor, Kokapet, Hyderabad

  • Area: 20,000 sq. ft.

  • Scope: Complete Electrical & Low-Current (ELV) Turnkey Fit-Out

  • Key Features: 400 Workstations, Dedicated Server Room, Conference Facilities

  • Your Role: Design, BOQ, Installation, Testing & Commissioning

  • Status: Completed & Operational

The Client's Vision & Challenge

The client needed to rapidly transform a 20,000 sq. ft. shell space into a premium, tech-ready co-working facility to cater to IT professionals and startups. The primary challenge was ensuring zero downtime for power and data for 400 concurrent users while creating a flexible, aesthetically pleasing environment that could adapt to future tenant reconfigurations—all within an aggressive timeline.

Our Comprehensive Solution

Maxwell Engineers delivered an end-to-end electrical and data infrastructure package, creating a truly "Plug and Play" environment for the client and their members.

Phase 1: Precision Planning & Design

  • Detailed Drawings & BOQ: Created comprehensive electrical, lighting, and low-current (CCTV, Data, Fire Alarm) layout drawings, leading to a transparent and accurate Bill of Quantities for client approval.

  • Future-Proof Design: Engineered the cable infrastructure to allow for easy reconfiguration of workstations and cabins without requiring new cabling runs.

Phase 2: Core Electrical Infrastructure

  • Power Distribution: Designed and installed a robust main distribution board with dedicated feeders for workstations, servers, ACs, and common areas.

  • Workspace Electrification: Executed precise cable laying to all 400 workstations, conference rooms, cabins, and meeting rooms, providing ample power and data points at each location.

  • Specialized Rooms: Set up a dedicated, cooled Server/Electrical Room with clean power, enhanced earthing, and structured cabling backbone.

Phase 3: Low-Current Systems Integration

  • Data & Voice Network: Laid a structured cabling (CAT 6) backbone and drops to all points, creating a high-speed network ready for internet service provider integration.

  • Security: Installed a comprehensive CCTV system cabling for complete coverage.

  • Safety: Executed fire alarm and detector cable laying as per fire safety norms.

Phase 4: Lighting & Final Commissioning

  • Lighting System: Installed a complete, energy-efficient lighting circuit with ambient and task lighting controls.

  • Testing & Handover: Conducted rigorous testing of all electrical and data points, ensuring 100% functionality before the "Plug and Play" handover.

Results & Client Value Delivered

  • Accelerated Launch: The turnkey, coordinated execution enabled the co-working space to open for business on schedule.

  • Operational Reliability: The robust infrastructure has supported uninterrupted operations with zero critical power or network failures reported.

  • Scalability & Flexibility: The design allows the client to easily modify office layouts to suit new tenants, protecting their long-term investment.

Quxiy Software – IT Office Turnkey Fit-Out

Project at a Glance

  • Location: Myscape Weave, 4th Floor, Kokapet, Hyderabad

  • Area: 20,000 sq. ft.

  • Scope: Complete MEP & IT Infrastructure Turnkey Project

  • Client: Quxiy Software (Product Development Company)

  • Key Features: 420 Developer Workstations, Dedicated Server Farm, Advanced AHU-integrated Cooling

  • Your Role: MEP Design, AHU Planning, BOQ, Installation, Commissioning

  • Status: Completed & Operational

The Client's Specific Challenge

Quxiy Software required a high-performance technical workspace for 420 developers, with a critical need for advanced cooling to manage heat loads from continuous server and workstation operation. Unlike the flexible co-working space, this project demanded a permanent, optimized layout with superior air quality and stable power for long development cycles, all while maintaining stringent budgetary control from the initial BOQ stage.

Our Tailored, Integrated Solution

We provided a holistic solution that integrated mechanical (cooling) and electrical systems from the design phase, ensuring optimal performance.

Phase 1: Integrated MEP Design & Accurate Costing

  • MEP Coordination Drawings: Created detailed designs that seamlessly integrated Electrical, Data, and Air Handling Unit (AHU) ducting to prevent clashes and optimize ceiling space.

  • Precision BOQ & Budget Analysis: Developed a comprehensive Bill of Quantities covering all MEP and IT infrastructure, providing Quxiy with a fixed-cost, transparent budget for informed financial planning.

Phase 2: Critical Power & Cooling Infrastructure

  • High-Density Power Distribution: Installed a robust electrical network with dedicated circuits for server racks and high-performance workstations to prevent overloads.

  • AHU System & Climate Control: Designed and oversaw the installation of an energy-efficient AHU system with precise zoning to maintain optimal temperature and air quality in the server room and across the developer floor.

Phase 3: Mission-Critical IT & Safety Systems

  • Server Room Build-Out: Engineered a dedicated server/electrical room with enhanced cooling (precision AC), pure sine wave UPS, and a structured cabling backbone.

  • Comprehensive Cabling: Executed cable laying for 420 workstations, including high-speed data/voice (CAT 6A), CCTV security, and fire alarm systems, all neatly organized in tray conduits.

Phase 4: Lighting & Final Commissioning

  • Developer-Focused Lighting: Implemented an anti-glare, high-lux lighting system to reduce eye strain during long coding sessions.

  • End-to-End Testing: Conducted rigorous load testing of the AHU, power stability checks, and network connectivity validation for all 420 points before the final "Plug and Play" handover.

Results & Technical Value Delivered

  • Optimized Operational Environment: The integrated AHU and electrical design resulted in a stable, cool environment critical for server health and developer comfort, directly supporting productivity.

  • Budget & Schedule Adherence: The project was completed on time and within the approved BOQ budget, with no surprise costs for the client.

  • Infrastructure for Growth: The scalable design of the server room and network backbone allows Quxiy to easily add future server racks or expand the team.

Forray Software – Efficient MEP Infrastructure for a Growing Tech Firm

Project at a Glance

  • Location: Myscape Weave, 4th Floor, Kokapet, Hyderabad

  • Area: 20,000 sq. ft.

  • Scope: Turnkey Electrical, Cooling & IT Infrastructure

  • Client: Forray Software (Technology Solutions Provider)

  • Scale: 380 Workstations, Conference Facilities, Dedicated Server Room

  • Your Role: Full-Scope MEP Execution from Design to "Plug and Play" Handover

  • Status: Completed & Operational

The Client's Core Requirement

Forray Software needed a reliable, high-performance office for their 380-person team but sought an optimized solution that maximized value without over-engineering. The challenge was to design a right-sized MEP system—particularly for cooling (AHU) and power distribution—that met their precise operational needs, ensured future maintenance ease, and provided clear budgetary certainty from the outset through detailed BOQ preparation.

Our Value-Optimized, Integrated Solution

We delivered a tailored infrastructure that balanced performance with cost-effectiveness, focusing on precise capacity planning.

Phase 1: Right-Sized Design & Transparent Budgeting

  • Needs-Based MEP Design: Conducted detailed load calculations to design an AHU system and electrical network precisely sized for 380 workstations and the server load, avoiding unnecessary overcapacity and cost.

  • Definitive BOQ for Cost Control: Prepared a comprehensive Bill of Quantities that provided Forray with a fixed-price roadmap, eliminating budget uncertainty and allowing for efficient procurement.

Phase 2: Efficient Power & Climate Control Deployment

  • Zoned Electrical Distribution: Implemented a zoned power distribution model with dedicated panels for workstations, server room, and common areas, enhancing energy monitoring and circuit protection.

  • Optimized AHU Integration: Coordinated and installed the AHU ductwork with electrical conduits and data cabling in a single, efficient workflow to minimize ceiling space usage and installation time.

Phase 3: Robust IT & Safety Backbone

  • High-Availability Server Room: Built out a dedicated server/electrical room with focused cooling, clean power supply, and a structured cabling main distribution frame (MDF).

  • Future-Ready Cabling Infrastructure: Executed precision cable laying for all 380 workstations (data/voice CAT 6), a full CCTV security system, and fire alarm detection wiring, ensuring compliance and reliability.

Phase 4: Quality Lighting & Final Validation

  • Task-Ambient Lighting System: Installed an energy-efficient LED lighting scheme that provides excellent illumination for computer work while minimizing glare.

  • Commissioning for Reliability: Performed thorough point-to-point testing of all power, data, and safety systems, ensuring 100% operational readiness for a seamless "Plug and Play" client move-in.

Results & Client Benefits Delivered

  • Cost-Effective Performance: The right-sized AHU and electrical design resulted in lower upfront capital expenditure and reduced operational energy costs for the client.

  • Streamlined Project Execution: Clear BOQ and integrated MEP coordination led to a smooth installation process with minimal rework, ensuring on-time delivery.

  • Foundation for Scalability: The well-organized infrastructure allows for straightforward future modifications, whether adding team members or upgrading server capacity.

Co-karma – Repeat Engagement & Scalable Infrastructure

Project at a Glance

  • Location: Myscape Weave, 7th Floor, Kokapet, Hyderabad

  • Area: 7,000 sq. ft. (Phase 2 Expansion)

  • Scope: Turnkey MEP & IT Infrastructure for New Wing

  • Client: Co-karma (Repeat Client - Previous 4th Floor Project)

  • Scale: 170 Workstations, Executive Cabins, Server/Support Rooms

  • Your Role: Repeat Turnkey Partner – Design, AHU, BOQ, Installation, Handover

  • Status: Completed & Integrated with Existing Operations

The Client's Strategic Challenge

Following the successful launch of their 4th-floor flagship space, Co-karma needed to rapidly expand their capacity with a new 7th-floor wing. The primary challenge was ensuring seamless operational and aesthetic integration with their existing facility while replicating the reliability and "Plug and Play" convenience of the first project. This required a partner who deeply understood their systems, brand standards, and operational tempo.

Our Solution: Partnership-Based Replication & Integration

 Leveraging our experience from the 4th-floor project, we delivered a streamlined, efficient execution that mirrored their proven infrastructure with precise adaptations for the new layout.

Phase 1: Accelerated Design with Proven Templates

  • Adaptive Design & Drawings: Utilized and modified our existing design templates for Co-karma, rapidly creating MEP drawings tailored to the 7th-floor layout, significantly reducing planning time.

  • Streamlined BOQ & Budgeting: Prepared a precise BOQ based on the proven material and labor standards from the first project, providing Co-karma with predictable costs and fast financial approval.

Phase 2: Integrated MEP Core Build

  • Optimized AHU & Electrical Integration: Designed and installed a right-sized AHU system and electrical network, ensuring optimal climate control and power distribution for 170 workstations while planning for potential future interconnection with the 4th floor.

  • Dedicated Support Rooms: Built a consolidated server/electrical room with clear pathways for future inter-floor data and power links.

Phase 3: Cohesive IT & Security Deployment

  • Unified Cabling Standards: Executed cable laying (power, data/voice CAT 6, CCTV, fire alarm) using the same specifications and quality as the first project, guaranteeing uniform performance and simplifying future maintenance.

  • Seamless System Integration: Ensured the new security (CCTV) and safety (fire alarm) systems were planned for easy integration with the building's or Co-karma's central monitoring.

Phase 4: Consistent Brand Experience & Handover

  • Lighting Consistency: Implemented the same lighting design philosophy and fixtures to maintain a uniform ambiance and user experience across both floors.

  • Efficient Commissioning: Conducted rigorous testing and delivered another flawless "Plug and Play" workspace, enabling Co-karma to onboard new members immediately.

Results & Partnership Value Delivered

  • Trusted Partnership Validated: This repeat engagement stands as the strongest testament to Co-karma's satisfaction with our initial work on their 4th floor.

  • Reduced Time-to-Market: Leveraging prior knowledge and templates allowed for a significantly faster project timeline, enabling Co-karma to capitalize on market demand quicker.

  • Operational Harmony: The consistent infrastructure across both floors simplifies facility management, troubleshooting, and provides a seamless experience for members using either location.

  • Foundation for Portfolio Growth: This project solidifies a case study demonstrating our capability to support clients through multiple growth phases.